Coming 2026

Next-Generation Power, Uncompromising Safety

Launching in 2026, Genezen’s hybrid semi-solid state LFP system delivers 5 MW of clean energy.

High-capacity, fire-safe energy storage engineered for the next generation of large-scale power.

Genezen's hybrid semi-solid state LFP battery

Genezen is introducing a next-generation energy storage solution in early 2026. A hybrid semi-solid state LFP battery system that delivers unprecedented safety and power density.

With its advanced thermal stability and robust design, it offers peace of mind for high-capacity applications without compromising performance.

Next Generation Energy System

Delivered in a 20 Foot Container
0 MW

Housed in a standard 20-foot container, each system will deliver up to 5 MW of reliable, clean energy. Ideal for large-scale industrial, utility, and grid support projects. The compact footprint allows for rapid deployment, minimal site preparation, and flexibility in even the most space-constrained environments.

Massive Energy in a Compact Footprint

IEC Approved​

UL Pending

Already IEC-approved with UL certification pending in 2025, the system meets stringent international standards for safety and performance. It will be ready for projects worldwide that demand both maximum output and uncompromising safety.

Certified & Ready For Global Markets

a significant leap forward in energy storage

Full technical specifications, performance data, and deployment options will be released by the end of 2025. This technology represents a significant leap forward in energy storage and will join the Genezen portfolio as our most powerful energy solution yet.

Specs & Data